Actual Working Hours

  • Engineering world
  • kata
    • kata lucu
    • kata bijak
    • kata mutiara
    • kata cinta
    • kata gokil
  • lucu
    • gambar lucu
    • pantun lucu
    • tebakan lucu
    • kata lucu
    • cerita lucu
  • berita
    • berita unik
    • berita politik
    • berita artis
    • berita aneh
  • kesehatan
    • asam urat
    • kanker
    • jantung
    • hepatitis
    • ginjal
    • asma
    • lambung
  • gambar
    • gambar unik
    • gambar lucu
    • gambar aneh
    • gambar animasi
    • video lucu
  • hoby
    • burung
    • ikan
    • piaraan
  • contoh
    • surat lamaran
    • recount text
    • descriptive text
    • curriculum vitae
    • deskripsi
  • video
    • video lucu
    • video hantu
    • video polisi
    • video totorial
    • video panas
    • video lagu
  • blog
    • SEO
    • template
    • script
    • widget
    • backlink
    • imacros
  • komputer
    • excel
    • macro excel
Home » Chemical Engineering » Jobs » Problem » Actual Working Hours

Actual Working Hours

For your information, my official working time is from 8.30 am to 5.30 pm with lunch break interval from 1.00 to 2.00 pm. But, I normaly go home between 6.00 - 7.00 pm and hopefully reach home within an hour or more.

Within this limited space of time, I will try and do as much work as I can. However, there are two activities that further minimize and reduce my working time. The first one is "meeting" and the second is "interacting with suppliers". Let me reveal today as an example...

Everyday (including today), I have a minimum of 2 meetings which are held from 9.30 - 10.00 am (Maintenance/Project Meeting) and 11.30 am -1.00 pm (Production/Coordination Meeting). Total time spent for those meetings = 2 hours. That's why sometimes when my wife called, I have to say: "I'm in a meeting, I'll call you back later, honey..."

Upon reaching 1.00 pm, I'll have a break. This is my free time where I'll spend it either for lunch or short nap or surfing for info in the internet. Today, I did some surfing.

After lunch break, a supplier supplying filter sock came and met me. We talked and discussed few things regarding the filter sock problem and solution. Frankly speaking, I don't really know about filter sock. Therefore, anything that came out from the suppliers mouth, I just absorb it.

Later, another supplier selling bleaching earth came and beg us to purchase the product from him. We have not been ordering his bleaching earth since last November and he claimed that his business is geting from bad to worse. We have our reasons for not ordering the bleaching earth.

Meeting those 2 suppliers already cost me another 2 hours where I resumed working at 4.00 pm hours. Let me just simplify the situation:

Total official working hour = 8 hours
Time spent for meeting = 2 hours
Time spent meeting with suppliers = 2 hours
Balance time to do other work (preparing report(s), scheduling, inventory, monitoring plant and oil quality, phone calls, communicating with downlines etc) = 4 hours

To tell you the truth, 4 hours are sincerely not enough to do or complete the jobs. That's why most of the time I have to go back late. But I don't want to go back very late because the rate of work productivity has decrease. And I leave 50 km from my work place.
Ditulis oleh Bidadari, Selasa, 13 Februari 2007 04.42- Rating: 4.5

Judul : Actual Working Hours

Deskripsi : For your information, my official working time is from 8.30 am to 5.30 pm with lunch break interval from 1.00 to 2.00 pm. But, I normaly go...
keyword :Actual Working Hours, Chemical Engineering, Jobs, Problem

Belum ada komentar untuk "Actual Working Hours"

Posting Komentar

Posting Lebih Baru
Posting Lama
Beranda
Langganan: Posting Komentar (Atom)
Postingan Populer
  • Industrial Tools at their Best
     What exactly are industrial tools? Let me provide my understanding on what industrial tools actually are. Briefly, industrial tools are equ...
  • Xi Jinping , A Chemical Engineer to rule China
    Do you know that the present leader of China is trained as a chemical engineer from Tsinghua University , China? Let's get to know abou...
  • New Year 2013 - New set of Goals
    Time move so fast that 2012 has just left us just like that. 12 days has passed since we entered the new year 2013 and I have not yet wish y...
  • Getting A Hoist
    I need a hoist in the store (warehouse) to lift pallets and other heavy stuffs efficiently. Therefore, I looked and searched for companies s...
  • How to Calculate Your Carbon Footprint
    As a chemical engineer, it is imperative for us to care and know more about environment. It is our responsibility to educate those people ar...
  • Engineering Award
    Would it be nice to be awarded handsomely for our good and brilliant effort? Would it be wonderful to be recognized by our peers and profess...
  • How did thay do that? Great Infographic
    As an engineer, it is imperative for us to have basic and extra knowledge and facts. It is useful for our communication and personal usage a...
  • Understanding Plant Tips
    For you chemical engineers out there who happen to become a production executive or a process engineer (or what ever position it is named af...
  • (tanpa judul)
    My first Heat Exchanger Encounter.... It was in my third working place that i learn and have better comprehension about the heat exchanger. ...
  • Importance of Boiler Chemicals Water Treatment
    Since I have written my experience visiting a boiler manufacturing company recently, I think it is good if I follow up with another article...

Info Engineering world © Actual Working Hours