Steam Trap Failure Issue

  • Engineering world
  • kata
    • kata lucu
    • kata bijak
    • kata mutiara
    • kata cinta
    • kata gokil
  • lucu
    • gambar lucu
    • pantun lucu
    • tebakan lucu
    • kata lucu
    • cerita lucu
  • berita
    • berita unik
    • berita politik
    • berita artis
    • berita aneh
  • kesehatan
    • asam urat
    • kanker
    • jantung
    • hepatitis
    • ginjal
    • asma
    • lambung
  • gambar
    • gambar unik
    • gambar lucu
    • gambar aneh
    • gambar animasi
    • video lucu
  • hoby
    • burung
    • ikan
    • piaraan
  • contoh
    • surat lamaran
    • recount text
    • descriptive text
    • curriculum vitae
    • deskripsi
  • video
    • video lucu
    • video hantu
    • video polisi
    • video totorial
    • video panas
    • video lagu
  • blog
    • SEO
    • template
    • script
    • widget
    • backlink
    • imacros
  • komputer
    • excel
    • macro excel
Home » Chemical Engineering » Energy » Problem » Steam » Steam Trap Failure Issue

Steam Trap Failure Issue

As I read through the "Expert Q and A - Timely Detection of Steam Trap Failure" post in the Chemical Engineering Blog, I was called to share my opinion and experience. This is because I also have similar problem in my plant regarding maintaining the steam trap functionality. (P/s: For those who don't have an idea what is steam trap and how does it work, and what is the importance of steam trap, learn about it from Maintenance Resources). In the post, a question was asked:

Q: A steam trap tested as operational during an annual survey can fail at any point after the test. These failures go undetected until there is some type of system failure or until the next time a steam trap survey is performed. What is the most effective approach to detect failure and maintain a best-in-class steam system?

Tracy Clupper from Armstrong International (Specialist in utility system solution) responded and provided an answer which from my opinion is good.

A: When evaluating methods of testing steam traps, it is important for companies to be realistic about their current needs and capabilities. A company with plans to implement an annual in-house trap-management program with no dedicated or trained personnel is wasting time and money. Hiring a third party to test traps and provide a condition and savings report can be a more effective way to manage a trap population when in-house labor is not available. This approach, however, does not solve the problem of system-related emergencies due to undetected trap failure, nor does it afford the ability to truly capitalize on energy-related savings. One failed-open, high-pressure drip trap can cost a company thousands of dollars in annual steam losses. These losses are shown on a static report as a function of a trap that has failed for an unknown period of time. There is no cost avoidance in this situation, only the potential to stop losses that have already occurred. In addition, the impact of high-pressure steam traps discharging into lower pressure parts of the condensate system can be detrimental to the overall efficiency of the entire system. A 24/7 monitoring system can more effectively detect and identify points of failure for immediate maintenance response. Both hard wired and wireless systems are available on the market. The key to implementing any continuous monitoring system successfully is to identify the costly, critical or dangerous areas of the steam system and target those areas first. Then evaluate the continuous monitoring system’s reporting capabilities; keeping in mind that immediate notification of trap failure is critical, but savings validation is also important toward proving the monitoring system’s effectiveness toward true cost avoidance.

Here I just want to add up some points to what Tracy Clupper has mentioned above (which I added inside the post comment section).

Initially, in my plant, there are nobody monitoring the steam traps. As a result, the steam consumption increase and our vacuum system became inconsistent. After realizing the situation (effect of steam trap failure), we assigned one manpower (from maintenance department) to inspect and record the steam trap temperature inlet and outlet every 2 months. We can know the steam trap is failing if the inlet and outlet temperature is different. However, this is still not enough, because the steam trap may fail in between those two months. Therefore, I asked my supervisors to check all the steam traps every time they round the plant during shift. They don't have to carry with them a temperature gun to check the temperature. They just need to feel the steam trap inlet and outlet by their bare hand (just a touch and it's not dangerous!). If the outlet is colder than usual, that means the steam trap is not working!!! Because steam is not flowing through. It is a simple practice, however, ensuring them to continuously doing the inspection on a daily basis is another challenge. I'm thinking of making a checklist, so they can follow the checklist and feel all steam traps available in the plants, and have the black and white record.

Hiring a third party is also a good option, but why need to pay them if we can enforce or ask our own people/staff to do it. Well, if the company have the luxury, than that's another story! Well, those are just my opinion about the steam trap failure issue.

If you enjoyed this post then subscribe to CHEMICAL ENGINEERING WORLD.

Ditulis oleh Bidadari, Jumat, 30 Maret 2007 19.48- Rating: 4.5

Judul : Steam Trap Failure Issue

Deskripsi : As I read through the "Expert Q and A - Timely Detection of Steam Trap Failure " post in the Chemical Engineering Blog, I was cal...
keyword :Steam Trap Failure Issue, Chemical Engineering, Energy, Problem, Steam

Belum ada komentar untuk "Steam Trap Failure Issue"

Posting Komentar

Posting Lebih Baru
Posting Lama
Beranda
Langganan: Posting Komentar (Atom)
Postingan Populer
  • Industrial Tools at their Best
     What exactly are industrial tools? Let me provide my understanding on what industrial tools actually are. Briefly, industrial tools are equ...
  • (tanpa judul)
    More Design of Experiment Infos Today, I received some input/info from Mr. John Hunter (Son of William Hunter, one of the various Design of ...
  • Xi Jinping , A Chemical Engineer to rule China
    Do you know that the present leader of China is trained as a chemical engineer from Tsinghua University , China? Let's get to know abou...
  • Master / Ph.D in Chemical Engineering Wanted
    A friend of mine (Dr. Mohanad El-Harbawi) from Universiti Teknologi Petronas has some research student vacancies. He is looking for 1 master...
  • New Year 2013 - New set of Goals
    Time move so fast that 2012 has just left us just like that. 12 days has passed since we entered the new year 2013 and I have not yet wish y...
  • Chemical Engineering Site
    I'm developing a website to collect and centralize chemical engineering information and knowledge, news and updates, links and subjects....
  • 3 Blogs You Need to Check Out
    Since I began this blog in August 2006, I did not notice other blogs related or dedicated to chemical and process engineering. That time, I...
  • My Ph.D progress and some sharing
    After 2 months doing my research attachment in School of Chemical Engineering and Advance Material (CEAM), Newcastle University, I finally ...
  • My 5 Days Break
    I'm going to celebrate Hari Raya Eidulfitri Festive season a day after tomorrow. It's a big day for me and my family and the rest of...
  • How did thay do that? Great Infographic
    As an engineer, it is imperative for us to have basic and extra knowledge and facts. It is useful for our communication and personal usage a...

Info Engineering world © Steam Trap Failure Issue