Found Abnormality, Take Immediate Action

  • Engineering world
  • kata
    • kata lucu
    • kata bijak
    • kata mutiara
    • kata cinta
    • kata gokil
  • lucu
    • gambar lucu
    • pantun lucu
    • tebakan lucu
    • kata lucu
    • cerita lucu
  • berita
    • berita unik
    • berita politik
    • berita artis
    • berita aneh
  • kesehatan
    • asam urat
    • kanker
    • jantung
    • hepatitis
    • ginjal
    • asma
    • lambung
  • gambar
    • gambar unik
    • gambar lucu
    • gambar aneh
    • gambar animasi
    • video lucu
  • hoby
    • burung
    • ikan
    • piaraan
  • contoh
    • surat lamaran
    • recount text
    • descriptive text
    • curriculum vitae
    • deskripsi
  • video
    • video lucu
    • video hantu
    • video polisi
    • video totorial
    • video panas
    • video lagu
  • blog
    • SEO
    • template
    • script
    • widget
    • backlink
    • imacros
  • komputer
    • excel
    • macro excel
Home » Uncategories » Found Abnormality, Take Immediate Action

Found Abnormality, Take Immediate Action

Just now in the afternoon, I walked pass my plant and i saw the suction pipe to the 37.5kW pump delivering water to one of my cooling tower is vibrating badly. I have a closer look to inspect it. I saw water dripping from it and i felt that the pipe is already very thin. The pipe has experienced a bad errosion from the acidic water flowing through it. I immedietly called my plant operator and asked them to switch pump, and called maintenance team to replace piece of the pipe which is already beginning to break down into pieces. After issuing a job order to rectify the situation, maintenance team prepared their stuff and immedietly came to the site and replaced the piece of pipe which is badly fractured. Within 2 hours from the time i informed my operator, everything was sorted out smoothly and the suction pipe to the pump has is ready to resume operation.

Morals:

1. When you see some abnormality(s), immedietly report or take action.
2. Anything that might affect your plan process/system, must be immedietly rectified.
3. Never delay any abnormality or problem - you might forget about it, and after a few hours of taking action, it might be late!
4. Follow up! Do not take any instruction you gave for granted. Maybe your downline delay it. So, create some urgency in the instruction depending on the situation.
5. I cannot think for some more....I'm exhausted....
Ditulis oleh Bidadari, Senin, 04 Desember 2006 04.46- Rating: 4.5

Judul : Found Abnormality, Take Immediate Action

Deskripsi : Just now in the afternoon, I walked pass my plant and i saw the suction pipe to the 37.5kW pump delivering water to one of my cooling tower ...
keyword :Found Abnormality, Take Immediate Action,

Belum ada komentar untuk "Found Abnormality, Take Immediate Action"

Posting Komentar

Posting Lebih Baru
Posting Lama
Beranda
Langganan: Posting Komentar (Atom)
Postingan Populer

Info Engineering world © Found Abnormality, Take Immediate Action